Easier than laying tiles

Measuring and planning

 

Divide the floor into a series of rectangles.  From these measurements you can calculate how many mats you’ll need and what sizes.  Exclude permanent or static fixtures from your calculations.

Floor preparation

If the floor is screed over concrete, it is advisable to lay insulation boards to minimise heat loss and ensure quicker warm up times.

Laying the Professional Matting System

Lay the first run.  At the end of the run cut the mat leaving the cable intact, turn the mat through 90º or 180º and continue laying.  When the area is covered, adjust the mat until the loops are equal distance apart.  Now attach the mat to the subfloor using the special tape supplied.

Connecting to the power supply

You will need to install an RCD fused spur which powers the thermostatic controller/programmer and the matting system heating element network.

Lay the temperature probe from the timer-thermostat onto the floor, equidistant between two of the cable loops, and attach it to the floor surface.  Now take the unheated power supply cable from the end of the matting system, which should be positioned near the thermostat. 

Once all the connections have been made to the power supply, run the heater(s) to ensure they are heating up (no more than 10 minutes).

 

Completing the job

Either lay a thin, self-levelling screed over the mat and leave it to go off before laying tiles or trowel flexible tile adhesive directly over the mat and lay the floor tiles.  Once the grouting is complete, let the tile adhesive cure before switching on the system.