Dual Overlay Installation
The Warmup® Dual Overlay is a floating sub-floor. It is not fixed to the floor below. Each layer is laid out with staggered joints and arranged so that the top boards overlap the joints in the baseboards.
Baseboards are thinner and have a protective plastic film to keep the self-adhesive coating clean. This is laid facing upwards and the film is left in place until cutting and fitting is completed. The top boards are thicker and have no plastic film over the adhesive coating.
Now you have installed the Warmup® Dual Overlay boards you can either glue your final floor finish to the boards as a final layer or simply lay it freely upon them. Before installing the final floor finish test the Warmup® foil heater(s) and floor sensor to ensure that no damage has occurred during the installation. This method of installation will provide a stable surface for the floor finish to rest on and avoid any joints showing through the final floor finish.
Now you have installed the Warmup® Dual Overlay boards you can either glue your final floor finish to the boards as a final layer or simply lay it freely upon them. Before installing the final floor finish test the Warmup® foil heater(s) and floor sensor to ensure that no damage has occurred during the installation.