HomeCase StudiesTeddington Riverside, UK

Teddington Riverside, UK

Teddington Riverside, UK

Project
Teddington Riverside, UK
Project type
Residential parking ramp
Project location
London, UK
Project size
120m2
Heating system
2608 metres of Warmup Snow Melt Cable, 25W/m and ETR2 controller
System specifications
  • Warmup Snow Melt Cable
  • ETR2 controller

The Challenge

A new luxury riverside housing development in London included steep ramps to the car parking facilities and the planners were concerned that these could freeze over in extreme winter temperatures, causing significant problems for the residents.

The Solution

Warmup supplied and installed 322 Metres of Snow Melt Cable and an ETR2 controller to ensure that the ramp surface would be kept at a higher temperature than the cold air temperatures of Winter that enable snow and ice to accumulate.

The Result

A super-effective and super-efficient installation with super-happy residents.

Product information

Snow Melt Cable

ETR2 controller

Have any questions about Warmup?