London Docks Phase 1

London Docks

London Docks


◩ Project Type

Residential

◩ Project location

London

◩ System specifications
  • StickyMat system
  • Wall heaters
  • 6mm insulation board
  • 3iE
◩ Client

Berkeley Homes

◩ Heating system

Electric System

◩ Project size

385 Bathrooms

London Docks Project

The Challenge

With projects works on three St. George sites running simultaneously, site installation had to be seamlessly integrated with the exact projects schedules.

The Solution

By supplying a dedicated installation team, Warmup increased the resources for St. George sites installation to ensure no delays occurred. Electric underfloor heating with Wall Heaters were installed in the bathrooms of these luxurious apartments.

The Result

Coordinated works resulted in schedules on all three sites being met with blocks A and B London Docks nearing completion.

Product information

Find out more about the UFH products used in this project.


Have any questions about Warmup?

If you’re interested in specifying floor heating in your next project, get in touch with us today.

Related Projects

You can use these sections to highlight the features of heading. Use these paragraphs to focus on the topic you want. Make sure you keep it short, attractive


Scroll to Top